House Construction
Nov. 22nd, 2004 12:38 pmHere's some pictures of the framing that the drywall will be going on. Unfortunately, they don't make it very clear, but there's basically these erector-set scaffolds built just inside where the wall will be.
no subject
Date: 2004-11-22 12:42 pm (UTC)no subject
Date: 2004-11-22 12:59 pm (UTC)(I tried to draw a sketch of the floor plan, but it failed badly, with everything being about the same size).
Third Floor Reader-Response
Date: 2004-11-23 08:14 am (UTC)Not precisely unstable, but more accurately described as metastable, the binary opposition of the third floor is an excited-state-to-ground-state transition with asymmetric quantum numbers. The ideal reader