firstfrost: (Default)
[personal profile] firstfrost
[livejournal.com profile] harrock has moved from deconstruction to construction on the third floor. Well, there was the electrical stuff before, but now it's into drywall. [livejournal.com profile] ilhander helped with the Great Shopping and Carrying, and drywall has begun to magically coat the upstairs.

Here's some pictures of the framing that the drywall will be going on. Unfortunately, they don't make it very clear, but there's basically these erector-set scaffolds built just inside where the wall will be.

Date: 2004-11-22 12:59 pm (UTC)
From: [identity profile] firstfrost.livejournal.com
The third floor was previously (I think) legitimately interpreted as a bedroom-with-closet, plus another random room. Or as two random rooms with a Fishtank Containment Unit in between. Having no preference for a fishtank, or a second spare bedroom, we decided that the closet-cum-fishtank-storage-area was just not a useful structural feature.

(I tried to draw a sketch of the floor plan, but it failed badly, with everything being about the same size).

Profile

firstfrost: (Default)
firstfrost

February 2026

S M T W T F S
1234567
891011121314
15 161718192021
22232425262728

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 17th, 2026 11:12 pm
Powered by Dreamwidth Studios